136k views
2 votes
The sum of the speeds of two trains is 719.9 miles per hour. If the speed of the first train is 8.1 mph faster than that of the second train, find the speeds of each.​

User Aron C
by
5.3k points

1 Answer

5 votes

Answer:

first train: 364 mph

second train: 355.9 mph

Explanation:

719.9 = x+x+8.1

711.8 = 2x

x = 355.9

User Hanynowsky
by
5.1k points