Elizabeth company has 10,000 units of their new product in warehouse. They sold 10,000 in pre-order that will need to be shipped immediately. They are producing 1,000 units per week and they are receiving 700 order per week. How long will it take to fill the warehouse to maximum capacity at the current production rate?​

User Minimalpop
by
3.2k points

1 Answer

11 votes
11 votes

Answer:

m = 300w OR w = m/300

Explanation:

They start with 10k, but that's immediately sold, so they're back at a flat 0. Every week they gain 1000 but lose 700 for a net profit of positive 300.

Therefore, the maximum capacity would be 300 multiplied by the number of weeks. If we know the maximum, then the answer would be m (maximum) divided by 300.