182k views
2 votes
Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

User David Urry
by
7.0k points

1 Answer

5 votes

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

User Surenyonjan
by
7.3k points