A weight lifter raises a 1600 N barbell to a height of 2.0 meters. How much work was done? W = Fd

A) 30 Joules
B) 3000 Joules
C) 320 Joules
D) 3200 Joules

User Chrmod
by
4.3k points

2 Answers

1 vote

the answer is D ithink because you have to times :

1600*2.0=3200 joules


User Asik
by
5.0k points
5 votes

Answer : The correct option is, (D) 3200 Joules

Solution : Given,

Force applied = 1600 N

Displacement = 2 m

Formula used :


W=F* d

where,

W = work done

F = applied force

d = displacement

Now put all the given values in the above formula, we get the work done.


W=F* d=(1600N)* (2m)=3200J

Therefore, the amount of work done was, 3200 Joules