Answer:
The work done is 90kJ, with power delivered 30kJ/s.
Step-by-step explanation:
Work done is proportional to the product of force and displacement. Assuming the motion is in a straight line and the force acts along that line only, the work is calculated as follows:

The work done is 90kJ.
The power is work done per time unit:

The power delivered in the 3 seconds is 30kJ/s