Answer:
If the solar panels produced 110% as much power as expected that means they generated 10% more than planned.
Even though there is 10% more than what was expected they still generated 100% of all energy planned
Because of this we know that they produced 110/100 of power expected as a fraction, or 11/10
Explanation: