A 271⁄2-mile stretch of road needs repaving. A company bid on the repaving project, saying they could repave 21⁄4 miles of road per week. How many weeks will the company take to completely repave the stretch of road? A. 151⁄2 B. 121⁄3 C. 131⁄2 D. 122⁄9

User Evan P
by
5.6k points

2 Answers

2 votes

Answer:

D.)12 2/9

Explanation:

27 1/2 / 2 1/4= 12 2/9

User Techdude
by
5.1k points
3 votes

Answer:

D. 12 2⁄9

Explanation:

We know that the total stretch of the road which needs repaving is
27(1)/(2) mile and the company says that they can repave
2(1)/(4) miles of road per week.

So first of all, we will convert these numbers into an improper fraction:


27(1)/(2) =
(55)/(2)


2(1)/(4) =
(9)/(4)

Now we will divide the total stretch of the road by the number of miles that can be repaved each week:


((55)/(2))/((9)/(4))


(55)/(2)*(4)/(9)


12(2)/(9)

Therefore, option D. 12 2⁄9 is the correct answer.