Answer:
Explanation:
Work done= rate *time
let time taken by X to produce w widgets be t days
rate = w/t
Since X take 2 days longer rate for Y would be
rate= w/t-2
combined rate is (w/t+w/t-2)
Since in 3 days both x and y can produce 5w/4
(w/t+w/t-2)= 5w/4
5t2 -34t +24=0
(t-6)(t-4/5)=0
t=6 or t=4/5(not possible because t-2(time taken by Y) comes out to be -6/5 which is not possible)
so t=6 days which is the time taken by X to produce w widgets
so time taken to produce 2w widgets will be 12 days.