Answer: $72.41 per setups
Step-by-step explanation:
The activity rate for the machine setups activity cost pool under activity-based costing would be calculated as the estimated overhead cost divided by the total expected activity. This will be:
= 50687/700
= $72.41 per setups
Therefore, the answer is $72.41 per setups.