Answer:
b. $750 per direct labor
Step-by-step explanation:
Calculation for the what was the predetermined overhead rate
Using this formula
Predetermined overhead rate=Factory overhead / Direct labor hours
Let plug in the formula
Predetermined overhead rate=$1,500,000/$200,000 hours
Predetermined overhead rate= 7.5*100
Predetermined overhead rate=$750 per direct labor
Therefore the predetermined overhead rate will be $750 per direct labor