Answer:
$289,000
Step-by-step explanation:
Predetermined overhead rate (Fixed) = Budgeted Fixed overhead cost / Budgeted hours
Predetermined overhead rate (Fixed) = 300,000/60,000
Predetermined overhead rate (Fixed) = $5 per hours
Applied Fixed overhead = Standard hours allowed × Predetermined overhead rate(fixed)
Applied Fixed overhead = 57,800 * $5 per hours
Applied Fixed overhead = $289,000
So, the fixed overhead applied to production during the period is $289,000