Answer:
$180,000
Step-by-step explanation:
Amount of overhead should be included in the cost of the self-constructed asset = Fixed overhead that would be allocated to asset + Variable overhead attributable to self-construction
= $80,000 + $100,000
= $180,000
Thus, $180,000 is the amount of overhead that should be included in the cost of the self-constructed asset.