Answer:
Controllable variance
Step-by-step explanation:
The controllable variance is the combination of the variable overhead, fixed overhead spending variance and together with this, the variable overhead efficiency variance is also involved
Hence, as per the given situation, the controllable variance is to be considered
Therefore the above represents the answer