The number of days to renovate a house, with 6 men, doing the job is 8 days. How many men need to work on the job if it takes 12 days to complete it ?

User Rockcat
by
4.9k points

2 Answers

12 votes

Answer:

9 men

Explanation:

If 6 men are required to complete a job in 8, than 9 men would be required for a 12 day job.

12-8=4 which is half of 8

Half of 6 is 3

6+3=9

User Ruzanna
by
6.2k points
5 votes

Answer:

4 men

Explanation:

• Let x be the number of men needed to do the work I need 12 days.

•• it’s clear that the two variables (number of men and number of hours are in inverse proportion)

•• Which means their product is always equal to a constant.

Therefore

12 × x = 6 × 8 = 48

Then

x = 48 ÷ 12

= 4