Answer:
Under/over applied overhead= 155,000 overapplied
Step-by-step explanation:
First, we need to calculate the predetermined overhead rate:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 300,000/200,000
Predetermined manufacturing overhead rate= $1.5 per direct labor dollar
Now, we can allocate overhead:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Allocated MOH= 1.5*260,000
Allocated MOH= $390,000
Finally, the over/under application:
Under/over applied overhead= real overhead - allocated overhead
Under/over applied overhead= 235,000 - 390,000
Under/over applied overhead= 155,000 overapplied