Answer: 22 person-hours
Explanation:
It takes 14 hours to break up the driveway and then to clear away the rubble.
Then it takes 8 hours to pour the concrete and smooth it.
Total time it will take to break up a driveway, clear away the rubble, pour the concrete, and smooth the concrete will therefore be;
= 14 + 8
= 22 person-hours