170k views
3 votes
The Table Shows The Number Of Rows Of Bricks A Worker Can Lay In Different Numbers Of Hours

Number Of Hours.
4
6
8
10

Number Of Rows
12
18
24
30


How Many Bricks Can The Worker Lay Each Hour?

A 2
B 3
C 6
D 9


User Soatl
by
4.6k points

1 Answer

1 vote
The answer is 3. If you set it up in a T table and label x as the number of hours and y as the number of rows. Then use rise over run (y over x) the fractions simplify to 3 over 1.
User Robin Burchell
by
5.3k points