Answer:
Results are below.
Step-by-step explanation:
First, we need to calculate the predetermined overhead rate for each activity:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Activity 1= 41,400/1,500= $27.6 per unit of activity
Activity 2= 15,720/1,200= $13.1 per unit of activity
General Factory= 30,510/900= $33.9 per direct labor hour
Now, we can allocate overhead to product B:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Activity 1= 27.6*500= $13,800
Activity 2= 13.1*400= $5,240
General Factory= 33.9*300= $10,170
Total allocated overhead= $29,210
Unitary allocated overhead= 29,210/1,500= $19.47