Answer:
Unitary cost A= $21
Unitary cost B= $10.1
Step-by-step explanation:
First, we need to calculate the predetermined overhead rate for each activity:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Machine setup= 360,000/4,000= $90 per setup hour
Materials handling= 85,000/17,000= $5 per pound
Electric power= 50,000/25,000= $2 per killowat
Now, we can allocate overhead to each product:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Product A:
Machine setup= 90*100= $9,000
Materials handling= 5*2,000= $10,000
Electric power= 2*2,000= $4,000
Total= $23,000
Product B:
Machine setup= 90*200= $18,000
Materials handling= 5*2,000= $10,000
Electric power= 2*4,000= $8,000
Total= $36,000
Finally, the total cost and unitary cost:
Product A:
Total cost= 39,000 + 22,000 + 23,000= $84,000
Unitary cost= 84,000/4,000= $21
Product B:
Total cost= 38,000 + 27,000 + 36,000= $101,000
Unitary cost= 101,000/10,000= $10.1