Answer:
Allocated MOH= $92,625
Step-by-step explanation:
First, we need to calculate the predetermined overhead rate:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 97,500 / 3,000
Predetermined manufacturing overhead rate= $32.5 per direct labor hour
Now, we can allocate overhead:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Allocated MOH= 32.5*2,850
Allocated MOH= $92,625