Answer:
The correct answer is C) Electrical Contractor
Step-by-step explanation:
EWR refers to Electrical Work Request.
According to the EWR Specifications, the Contractor is responsible for picking up and disposing of debris or rubbish from equipment installed by the electrical contractor on the project.
The EWR specification state that:
For the disposal of building waste materials, and garbage, the contractor shall have on-site enclosed dumpsters or bins and shall regularly eliminate the items referred to above from the site.
Cheers