Answer:
5 containers
Step-by-step explanation:
As we know that:
N = D*T*(1 + X) / C
Here
N is number of kanban containers required
D is the planned usage rate of employee work which is 2000 wheels a day
T is the summation of lead time and average production time (Days)
which means
T = Waiting time + Average Production Time = 0.25 + 0.15 = 0.4 days per container
X is the policy variable which is 10% here
C is capacity of container which is 200 wheels
By putting the above values, we have:
N = 2000 *0.4 *(1 + 10%) / 200
= 4.4 containers are required which means 5 containers because rounding down will result in loss of contribution hence we must round upward.