106k views
5 votes
The vertices of the feasible region are (70, 10), (30, 10), and (30, 50). To maximize the profit, the company should produce units of product A and units of product B. The maximum profit is ....

User Seanbehan
by
4.3k points

2 Answers

5 votes

Answer:

The vertices of the feasible region are (70, 10), (30, 10), and (30, 50). To maximize the profit, the company should produce

70

units of product A and

10

units of product B. The maximum profit is $

1130

.

User Roberto Aguilar
by
4.7k points
5 votes

Answer:

What objective function can be used to maximize the profit?

P = 15 a + 8 b

The vertices of the feasible region are (70, 10), (30, 10), and (30, 50). To maximize the profit, the company should produce 70 units of product A and 10 units of product of product B. The maximum profit is $1130.

User Mikera
by
5.4k points