Answer:
unitary manufacturing cost= $101.1
Step-by-step explanation:
Giving the following information:
Each ceiling fan has 20 separate parts.
The direct materials cost is $70 and each ceiling fan requires 3 hours of machine time to manufacture.
Activity Allocation Base Predetermined Overhead Allocation Rate
Materials handling Number of parts $ 0.08
Machining Machine hours 7.6
Assembling Number of parts 0.2
Packaging Number of finished units 2.7
First, we need to allocate overhead using the following formula:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Materials handling= 0.08*20= $1.6
Machining= 7.6*3= $22.8
Assembling= 0.2*20= $4
Packaging= 2.7*1= $2.7
Total allocate overhead per unit= $31.1
Now, we can calculate the unitary manufacturing cost:
unitary manufacturing cost= 70 + 31.1
unitary manufacturing cost= $101.1