Answer:
More than 150 but less than or equal to 200 minutes ( C )
Step-by-step explanation:
using Johnson's sequencing rule
attached below is a tabular solution of showing the use of Johnson's sequencing rule
The End of job sequence B = 172 minutes which means that the make span of the sequence is More than 150 but less than or equal to 200 minutes