Answer:
3.1 pounds
Explanation:
Data provided for calculating the direct materials quantity per unit is here below:-
Quantity required per unit = 2.5 pounds
Allowance for waste = 0.5 pounds
Allowance for spoilage = 0.1 pounds
The calculation of standard direct materials quantity per unit is is shown below:-
Standard materials quantity per unit = Quantity required per unit + Allowance for waste + Allowance for spoilage
= 2.5 pounds + 0.5 pounds + 0.1 pounds
= 3.1 pounds
Therefore for calculating the standard direct materials quantity per unit we simply added the quantity required per unit, allowance for waste and allowance for spoilage.