$18,000 F
Step-by-step explanation:
Actual overhead– Overhead Budgeted=
Overhead Controllable Variance
Actual overhead=$194,000
Overhead Budgeted=$212,000
$194,000–$212,000
=$18,000 F
(40,000 ×$3.80) + $60,000
=$152,000+$60,000
= $212,000
Therefore the manufacturing overhead controllable variance is $18,000 F