One conveyor belt can move 1000 boxes in 9 minutes. Another can move 1000 boxes in 11 minutes. If another conveyor belt is added and all three are used, the boxes are moved in 3 minutes. How long would it take the third conveyor belt alone to do the same job?

1 Answer

0 votes

Answer:

It would take 7.62 minutes for the third conveyor belt alone to do the same job

Explanation:

The together rate is the sum of each separate rate.

In this question:

First conveyor: Rate of 1/9.

Second: Rate of 1/11.

Third: Rate of 1/x.

Total: 1/3

So


(1)/(9) + (1)/(11) + (1)/(x) = (1)/(3)


(11x + 9x + 99)/(99x) = (1)/(3)


(20x + 99)/(99x) = (1)/(3)


3(20x + 99) = 99x


60x + 297 = 99x


39x = 297


x = (297)/(39)


x = 7.62

It would take 7.62 minutes for the third conveyor belt alone to do the same job