Answer:
variable overhead rate variance $ 6,297 favourable
Explanation:
The variable overhead rate variance is the difference between the actual variable overhead cost and the actual hours multiplied by the standard variable overhead rate.
$
2740 hours should have cost (2740×$4.20) 19728
but did cost 13,431.
variable overhead rate variance 6,297 favourable