Answer:
$530,000
Step-by-step explanation:
Given that
Fixed manufacturing cost = 50000
Variable manufacturing cost = 12 per ton steel
Total number of steal produced = 40000
Recall that
Total manufacturing cost = Total fixed manufacturing cost + total variable manufacturing cost
Total variable manufacturing cost = variable cost per ton × output
= 40000 × 12
= 480,000
Therefore,
Total manufacturing cost = 50000 + 480000
= $ 530,000
Total manufacturing cost = $530,000