41.7k views
3 votes
A crane lifts a 400 N crate full of baked beans 15 m. How much work was done by the crane?

User DharmanBot
by
6.5k points

1 Answer

0 votes

Answer:

6000 J

Step-by-step explanation:

work = F x S

work = 400 x 15

work = 6000 J

User Chhaya
by
5.6k points