Answer:
PW = -30,000 + 6,000(P/A, 8.5%, 6) - 1,000(P/F, 8.5%, 3) + 8,000(P/F, 8.5%, 6)
= -30,000 + 6,000(4.5536) - 1,000(0.7829) + 8,000(0.6129)
= -30,000 + 27,321.60 - 782.90 + 4,903.20
= $1,441.90
Project's worth will be $1,441.90 as calculated above.
Negative sign shows cash outflow and positive sign shows cash inflow.