59.9k views
0 votes
A construction worker needs 3 2/3 pounds of concrete mix. He has 1 1/2 pounds of concrete mix in one bag, and he has 3 1/0 pound of concrete mix in another bag.

How many more pounds of concrete mix does the construction worker need?

Enter your answer as a mixed number in simplest form by filling in the boxes.

2 Answers

2 votes

Final answer:

The construction worker has more concrete mix than needed; he has an excess of 1 1/6 pounds and does not require any more.

Step-by-step explanation:

The student has asked how many more pounds of concrete mix a construction worker needs if he requires 3 2/3 pounds in total and already has 1 1/2 pounds in one bag and 3 pounds in another. To answer this, we need to add the amount of concrete the worker already has and subtract it from the total amount needed.

First, add the two amounts the worker has:

  • 1 1/2 pounds + 3 pounds = 4 1/2 pounds

Now, subtract this total from the amount needed:

  • 3 2/3 pounds - 4 1/2 pounds
    • To subtract, we need a common denominator, which is 6. Convert both numbers:
    • 3 2/3 pounds = 3 4/6 pounds
    • 4 1/2 pounds = 4 3/6 pounds
  • Now subtract: 3 4/6 pounds - 4 3/6 pounds = -1 -1/6 pounds

The negative result indicates the worker actually has more than enough concrete mix. Therefore, he does not need any additional concrete mix. In fact, he has an excess of 1 1/6 pounds.

User Adchilds
by
3.7k points
5 votes

Answer:

1 13/15 correct me if im wrong

Step-by-step explanation:

User Zahidul Islam
by
3.4k points