Suppose a furniture builder has two models of a bookcase: standard and artisan. The standard
model requires 4 hours to assemble and 2 hours for finishing touches. The artisan model requires 2
hours to assemble and 2 hours for finishing touches. Based on their current staffing, they can
manage a maximum number of assembly hours available is 48 per day, and the maximum number
of finishing hours available is 44 per day.
Let x = the number of standard model bookcases produced per day and y = the number of artisan
model bookcases produced per day.
Write the system of inequalities that represents the maximum number of bookcases that can be
produced in one day.

User Glr
by
3.1k points

1 Answer

16 votes
16 votes

Answer:

48 ≥ 4x + 2y

44 ≥ 2x + 2y

First, we will look at assembling hours.

"The standard model requires 4 hours to assemble [and] the artisan model requires 2 hours to assemble"

We also know they have 48 hours per day for assembly, x is standard model and y is artisan model.

48 = 4x + 2y

Lastly, they do not need to make that many, but they can so we will use greater than or equal to.

48 ≥ 4x + 2y

Now let us look at finishing hours.

"The standard model requires ... 2 hours for finishing touches. The artisan model requires ... 2 hours for finishing touches."

We also know they have 44 hours per day for assembly, x is standard model and y is artisan model.

44 = 2x + 2y

Again, they do not need to make that many, but they can so we will use greater than or equal to.

44 ≥ 2x + 2y