A machine has a setup time of 150 minutes and run time of 0.0075 minutes per piece. Order sizes are typically 10,000 pieces. After a batch is processed, the process has to be stopped and the machine has to be setup before the next batch can be processed. Assume that a day consists of two shifts and each shift is 450 minutes long.

Find the capacity in pieces per day for this machine under the following assumptions:

a. A batch can consist of only one order; it cannot have other orders in it. (8 pts)
b. Three orders are combined to form a batch. (8 pts)
c. All orders can be combined into one batch. (8 pts)
d. What is the percent change in capacity as you go from (i) to (ii) to (iii)?

User Scottmf
by
4.7k points

1 Answer

4 votes

Solution:

Given,

Setup time of machine= 150 min

0.0075 min/pc.

1 order =10,000 pcs.

1 day= 2 shifts X 450 min each

1 order per batch

10000 pcs per batch before setup required again

(150 min setup time) –> (75 min run time for 10000 pcs) –> (150 min setup time) –> (75 min run time for 10000 pcs) = 450 mins

Total for shift 1 = 20,000 pcs

Similarly, for Shift 2, total production cap = 20,000 pcs

So, total capacity in this case is 40,000 pieces/day

3 orders per batch

30,000 pcs per batch before setup required again

Shift 1: (150 min setup time) –> (225 min run time for 30,000 pcs) –> (75 min setup time) = 450 mins

Shift 2: (75 min setup time) –> (225 min run time for 30,000 pcs) –> (150 min setup time) = 450 mins

So, total capacity in this case is 60,000 pieces/day

All orders can be combined in one batch

No cap on number of orders in a batch

Shift 1: (150 min setup time) –> (300 min run time for 40,000 pcs) = 450 min

Shift 2: (450 min run time for 60,000 pcs) = 450 min

So, total capacity in this case is 100,000 pieces/day

From (i) to (ii) there is 50% increase in capacity

From (ii) to (iii) there is 66.67% increase in capacity