Answer:
a. Move sequence = 5 steps to + 5 step back + 3 step + 3 steps back = 16 steps
(assuming each step and movement is one second) time to perform activity
16 steps * 1 second + one second for grabbing 1 lb + 1 second for placing +1 second for snapping with pressure + 1 second for grabbing on tray + 1 second for placing + 1 second for tightening + 1 second for reaching to ratchet + second for placing bolt + 1 sec for setting aside + 1 sec for unsnapping
perform time = 25 seconds therefore plus +- 30 seconds
b. standard time = normal time + (normal time *10%)
= 25 + (25*0.1)
= 27.5 seconds
c. The process could be improved by having all the materials close by to the work bench or could have a second person helping to fetch things so to minimize movements and save time.
Step-by-step explanation: