Answer:
B
Explanation:
Let’s label the old machine as A while the new machine be labeled B
Firstly we establish the individual rates which have been given in the question:
A = 100 bolts/hour
B = 150 bolts/hour
Now, number of bolts made is rate in bolts/hour * time taken
Since we do not know the time taken, let the time taken be represented by x.
Since they are working together, the number of bolts produced by A in x hours would be 100x while the number of bolts produced by B in x hours is 150x.
We add both together to give the total number of bolts since they are working together.
The total number of bolts is thus: 150x + 100x. We have been given this total value to be 300. Hence:
300 = 150x + 100x
300 = 250x
x = 300/250
x = 1.2 hours
Since 1 hour is 60 minutes, 1.2 hours is same as 1.2 * 60 = 72 minutes