The major work elements defined in the statement of work (SOW) section along with the detailed list of deliverables provide the basis for creating a ___

User Mirco
by
7.5k points

1 Answer

6 votes

Answer:

Work Breakdown Structure (WBS)

Step-by-step explanation:

Note that, the statement of work (SOW) is usually used in project management to define project-specific activities, deliverables etc.

The Work Breakdown Structure (WBS) finally breaks down the project into smaller components as found in the image below. The image shows the case of a project breakdown to design and build a custom bicycle.

The major work elements defined in the statement of work (SOW) section along with-example-1
User Ncx
by
8.2k points