530,530 views
21 votes
21 votes
A construction company is building a new shopping mall. Following is an excerpt from their letter to the mayor about the new project. Identify the sentence that represents a preventive action to limit mass movement on the construction site. The site of the mall is within the city limits, near the base of a mountain. It is 1. 75 miles from a fracking site. An interstate highway will be carved out of the mountain and will pass over a pond. The excavation will place parts of the mall’s foundation approximately 2 inches below the water table line. A construction company has been called in to divert all excess water flowing into the pond to an unused natural reserve 800 feet away. The construction company is using the most technologically advanced methods.

User Mauvis Ledford
by
2.7k points

2 Answers

17 votes
17 votes

Answer:

See below

Step-by-step explanation:

A construction company is building a new shopping mall. Following is an excerpt from-example-1
User Theodor Zoulias
by
2.6k points
23 votes
23 votes

Answer:

A construction company has been called in to divert all excess water flowing into the pond to an unused natural reserve 800 feet away.

Step-by-step explanation:

The sentence clearly shows a preventive action to limit mass movement on the construction site.

Excess water significantly will make the soil saturated and saturated soil is prone to movement. That is, the company's action diverting excess water is definitely a preventive action to limit mass movement in the construction site.

User Hildensia
by
2.9k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.