A construction crew has repaired 1.37 miles of a highway. The total length of a high way is 7.9 miles. Their are m miles left to be repaired.
*Create an equation to show the relationship between the number of miles left to be repaired and the numbers of miles left to be repaired, m.
*How many miles are left to be repaired?