Each employee takes two 8 minute rest breaks and one 25 lunch break each shift. The company has 2 shifts per work day each with 4 employees. Compute the takt time if the company is planning to produce 1325 JU-4s.

User Xab
by
5.2k points

1 Answer

2 votes

Answer:

The appropriate answer is "
0.657 \ mins/JU-4s".

Step-by-step explanation:

Given:

Demand,

= 1325 JU-4s

1 day = 2 shifts

Assuming a shift is of 8 hours duration.

then,


1 \ shift = (8* 60)-(20+25)


=480-45


=435 \ mins

Total day mins,

=
435* 2

=
870 \ mins

hence,

The average throughput rate will be:

=
(870 \ mins)/(1325 \ JU-4s)

=
0.657 \ mins/JU-4s