202k views
1 vote
Select the correct answer.

A software development team is currently in the database creation phase of a project. Which activity will they undertake in this phase?
A.
memory allocation
B.
database design
C.
selecting a DBMS
D.
loading data

User Sameer Ek
by
8.1k points

2 Answers

3 votes

Answer:

memory allocation

User Triskweline
by
7.2k points
3 votes

Answer:

database design is the correct e

User Floam
by
6.8k points