122k views
0 votes
1. Production runs can be scheduled in A. only one shift B. always two shifts C. one or two shifts D. up to three shifts 2. Hiring the Needed Complement will always eliminate A. Overtime B. worker layoffs C. a Second Shift D. strikes 3. Management should strive to A. increase Turnover B. decrease Turnover 4. Increasing Capacity tends to A. reduce the Needed Complement B. reduce the number of workers on Second Shift C. reduce Overtime 5. Increasing Training Hours tends to A. increase the Needed Complement B. decrease the Needed Complement C. neither increase nor decrease the Needed Complement D. both increase and decrease the Needed Complement

User R B
by
3.9k points

1 Answer

0 votes

Answer:

1. C. one or two shifts

2. A. Overtime

3. B. decrease Turnover

4. B. reduce the number of workers on Second Shift

5. D. both increase and decrease the Needed Complement

Step-by-step explanation:

1. For twicing the production line, the shift capacity for the first time should be scheduled for each kind of product. The production run that more than the first shift capacity should be wither overtime or the second shift that based upon the worker complement

2. In the case when the required complement is hired for removing the over time so the workers who work in the second shift should be paid as similar to the workers who do overtime. Moreover, the second shift workers are highly efficient that ultimately decreasing the turnover

3. If there is reduction in the turnover so it decreased the recruitment cost

4. In the case when the capacity is increased so it decreased the no of workers who works in the second shift

5. In the short period, if there is increase in the training hours so it increased the requried complement

but if the time goes on to it rise the productivity of the worker due to which it reduced the required complement