Answer:
the predetermined overhead rate is $12.10
Step-by-step explanation:
The computation of the predetermined overhead rate is shown below:
The Predetermined overhead rate is
= (Estimated total fixed manufacturing overhead ÷ Estimated direct labor hours)
= ($121,000 ÷ 10,000)
= $12.10
hence, the predetermined overhead rate is $12.10