Answer:
He will have have to buy 1/32 spools
Explanation:
Because there is 100meters in each spool
4 spools of ribbon
One meter = 100 centimeters
3.6 X 100 = 360 cm needed
360/90= 4 spools needed
:))
1.6m questions
2.0m answers