IF 30 Men Car do a piece of Work in 30 days the

in how many days 10 men can complete the Same work​

User Shola
by
2.1k points

2 Answers

15 votes
15 votes
10 days because 30 men = 30 days, so in that logic 10 days = 10 men
User Manoj
by
2.9k points
16 votes
16 votes

Answer:

let, the days for 10 men be x

  • 30/10=x/30
  • 900=10x
  • x=900/10
  • x=90

so 10 men can complete the same work in 90days.

Hope it helps.