Answer: See explanation
Step-by-step explanation:
The cost allocation rate will be:
= 1147000 / (3300 + 2900)
= 1147000 / 6200
= 185
Cost allocated to X = 185 × 3300 = 610500
Cost allocated to Y = 185 × 2900 = 536500
1.6m questions
2.0m answers