If the contractor builds only colonial homes, she can build 120 homes with the $3.6 million of capital on hand. If the contractor builds only ranch style homes, she can build 90 homes with the $3.6 million of capital on hand. To maximize profit, the contractor should build 90 ranch style homes and 30 colonial homes, for a total of 120 homes. This will produce a profit of $1,080,000 ($90,000 from the 30 colonial homes and $990,000 from the 90 ranch style homes). This leaves 10 lots vacant.