Explain what the engineering team should advise in the following scenario.

Situation: An engineering team is analyzing a problem with a dam near a large metropolitan area. The dam reservoir has a capacity of 300 billion cubic feet, and it produces hydroelectric power for local municipalities. The dam has developed a severe crack.

User Kory
by
3.0k points

1 Answer

19 votes
19 votes

Answer: its c

Step-by-step explanation: