A factory process requires 3 steps to finish a product. The steps each have a mean completion time of u = 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is independent from the other steps. Let I be the total completion time of the 3 steps on a randomly chosen product.